capacity first build

Engineering Q1

Lean example: one engineering swimlane with lane capacity, item capacity, and utilization along the band. "On-call support" is 1 of 4 = 25% of the team. For warn/over/segment demos see tests/utilization-states.nowline.

theme: light now: 2026-02-09

bea64f3 Publish the review gallery to review.nowline.dev (#187)

First build in the history; nothing to compare against.

examples/capacity.nowline
nowline v1

// Lean example: one engineering swimlane with lane capacity, item capacity,
// and utilization along the band. "On-call support" is 1 of 4 = 25% of
// the team. For warn/over/segment demos see tests/utilization-states.nowline.

roadmap eng-q1 "Engineering Q1" start:2026-01-05 length:8w

swimlane engineering "Engineering" capacity:4
  item support       "On-call support" duration:8w capacity:1
  item auth-refactor "Auth refactor"   duration:3w capacity:2 status:in-progress
  item search-v2     "Search v2"       duration:2w capacity:2 after:auth-refactor