First build in the history; nothing to compare against.
tests/non-working-hide.nowline
nowline v1
// Named non-working days, hidden (m2p phase 5b, specs/working-calendar.md
// §4, §7.2, §10 Example B). With the default `non-working:hide`, a titled
// closure is cut out of the time axis and drawn as a labelled seam: a dotted
// line down from a label in the marker row that names it and counts the
// working days it removes ("Thanksgiving · 2d", "Company summit · 3d").
//
// The stressed axis is the labels and their packing:
// - Thanksgiving: Thu Nov 26 to Fri Nov 27, inside the Checkout bar, which
// is pushed out by the two days it loses.
// - Company summit: Wed Dec 9 to Fri Dec 11, inside the Rollout bar.
// - Launch: a Saturday milestone that hides onto the same x as the
// Thanksgiving seam, so the label packs onto its own marker row.
// Only dated, titled, non-working declarations are labelled.
config
non-working thanksgiving "Thanksgiving" start:2026-11-26 end:2026-11-27
non-working summit "Company summit" start:2026-12-09 end:2026-12-11
roadmap non-working-hide "Named days hidden" start:2026-11-23 scale:1w calendar:business
milestone launch "Launch" date:2026-11-28
swimlane a "A"
item checkout "Checkout" duration:1w
item qa "QA" duration:2d
item rollout "Rollout" duration:2w